SPACE Enfield, 34 new studios
New custom-built studios in the borough of Enfield on the 4th floor of a new build Attic storage, close to the busy Enfield retail park (B&Q, Next, Aldi etc).
All studios have windows, light, and uninterrupted views. 15 minute walk from Southbury station on the Weaver line, and with ample parking for cars and bikes.
Fully accessible with lift access.
Viewings are progressing now. Building completion is due in February 2025 after which the studios are ready to move into;
Please email to ‘viewing@spacestudios.org.uk‘ with ‘SPACE Enfield’ in the header to be on the viewing list for the next viewing.
The studios will be ready to move into from February 2025 onwards.
There are 34 studios available varying in size from 172 sq ft to 440 sq ft with monthly rents from £250 – £600 per month.
Still available are:
Studio 1 – 438 sqft – £639 per month
Studio 3 – 434 sqft – £633 per month
Studio 5 – 291 sqft – £424 per month
Studio 6 – 284 sqft – £414 per month
Studio 7 – 374 sqft – £545 per month
Studio 8 – 444 sqft – £648 per month
Studio 9 – 283 sqft – £413 per month
Studio 10 – 278 sqft – £405 per month
Studio 11 – 285 sqft – £416 per month
Studio 12 – 361 sqft – £526 per month
Studio 16 – 246 sqft – £359 per month
Studio 17 – 370 sqft – £540 per month
Studio 20 – 373 sqft – £544 per month
Studio 22 – 268 sqft – £391 per month
Studio 23 – 370 sqft – £540 per month
Studio 24 – 305 sqft – £445 per month
Studio 25 – 334 sqft – £487 per month
Studio 26 – 316 sqft – £461 per month
Studio 27 – 289 sqft – £421 per month
Studio 28 – 345 sqft – £503 per month
Studio 29 – 358 sqft – £522 per month
Studio 31 – 247 sqft – £360 per month
Studio 32 – 313 sqft – £456 per month
Studio 34 – 295 sqft – £430 per month
Further photos and details will be added.
New custom-built studios in the borough of Enfield on the 4th floor of a new build Attic storage.
All studios have windows, light, and uninterrupted views. 15 minute walk from Southbury station on the Weaver line, and with ample parking for cars and bikes.
Fully accessible with lift access.
Building completion in early January 2025 and viewings will be held from mid January 2025